S PARKER RD | SH83 over HIGHLINE CANAL TRAIL
250 FT W of E MISSISSIPPI · County 031, Colorado · Built 2022 · 7 Lanes · 29,000 vehicles/day
Overall
Culvert
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 9 | Excellent |
Location
39.696617, -104.897969
This bridge is in worse condition than 18.2% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 4 years old.
Nearby Bridges
SH 83 ML over HIGHLINE CANAL
Built 1976
E FLORIDA AVENUE over HIGHLINE CANAL
Built 1994
S VALENTIA STREET over HIGHLINE CANAL
Built 1995
SB QUEBEC ST over CHERRY CREEK
Built 2007
NB QUEBEC ST over CHERRY CREEK
Built 1983
S CHERRY CREEK DR over GOLDSMITH GULCH
Built 1960
MONACO PKWY over CHERRY CREEK
Built 1964
S MONACO STREET PA over STORM DRAINAGE
Built 1995
E MEXICO AVENUE over GOLDSMITH GULCH
Built 1966
S DAYTON STREET over HIGHLINE CANAL
Built 1972
Bridge Details
- Structure #
- D-08-PU-360
- Year Built
- 2022
- Length
- 8.7 m (28.5 ft)
- Max Span
- 4.3 m
- Width
- 75 m (246.1 ft)
- Lanes
- 7
- Daily Traffic
- 29,000
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.