US 285 NBND over S. PIERCE STREET

US HWY 285 OVER S PIERCE · County 059, Colorado · Built 2010 · 2 Lanes · 27,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
F-16-WK
Year Built
2010
Length
23.5 m (77.1 ft)
Max Span
22.6 m
Width
19.2 m (63 ft)
Lanes
2
Daily Traffic
27,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$851,000
Total Project Cost
$1,276,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.