SH 95 ML NBND over BEAR CREEK
Sheridan just N. of 285 · County 031, Colorado · Built 1961 · 3 Lanes · 15,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
39.653253, -105.048672
This bridge is in worse condition than 98.2% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 65 years old.
Nearby Bridges
SH 95 ML SBND over BEAR CREEK
Built 1961
US 285 ML over BEAR CREEK
Built 1993
US 285 ML over SH 95 ML
Built 1993
US 285 ML over RALEIGH STREET
Built 1995
S SHERIDAN BLVD over SOUTHWESTERLY GULCHES
Built 1996
LOWELL BLVD over BEAR CREEK
Built 1980
W QUINCY AVENUE over SOUTHWESTERLY GULCHES
Built 1986
US 285 NBND over S. PIERCE STREET
Built 2010
US 285 ML SBND over PIERCE STREET
Built 2010
US 285 NBND over SH 88/FEDERAL BLVD
Built 2012
Bridge Details
- Structure #
- F-16-FH
- Year Built
- 1961
- Length
- 32.7 m (107.3 ft)
- Max Span
- 10.3 m
- Width
- 12.5 m (41 ft)
- Lanes
- 3
- Daily Traffic
- 15,500
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $456,000
- Total Project Cost
- $501,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.