US 285 NBND over SH 121 ML

US HWY 285 OVER SH 121/WA · County 059, Colorado · Built 2012 · 2 Lanes · 24,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-16-WI
Year Built
2012
Length
45.1 m (148 ft)
Max Span
43.3 m
Width
19.2 m (63 ft)
Lanes
2
Daily Traffic
24,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$910,000
Total Project Cost
$1,366,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.