US 285 NBND over SH 121 ML
US HWY 285 OVER SH 121/WA · County 059, Colorado · Built 2012 · 2 Lanes · 24,500 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.652717, -105.081114
This bridge is in worse condition than 40.6% of bridges in County 059. The average bridge in Colorado is 0 years old; this one is 14 years old.
Nearby Bridges
US 285 ML SBND over SH 121 ML
Built 2012
US 285 NBND over S. PIERCE STREET
Built 2010
US 285 ML SBND over PIERCE STREET
Built 2010
US 285 ML over ESTES ST
Built 1991
SH121 ML-WADSWORTH over BEAR CREEK
Built 2012
ESTES STREET over BEAR CREEK
Built 1974
S OLD WADSWORTH BL over SOUTHWESTERLY GULCHES
Built 1968
S BALSAM WAY over SOUTHWESTERLY GULCHES
Built 1985
W QUINCY AVENUE over SOUTHWESTERLY GULCHES
Built 1986
US 285 ML over SH 95 ML
Built 1993
Bridge Details
- Structure #
- F-16-WI
- Year Built
- 2012
- Length
- 45.1 m (148 ft)
- Max Span
- 43.3 m
- Width
- 19.2 m (63 ft)
- Lanes
- 2
- Daily Traffic
- 24,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $910,000
- Total Project Cost
- $1,366,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.