RAMP TO US 40 ML over RAMP TOPOGRAPHY R

I 25 NB RAMP E TO COLFAX · County 031, Colorado · Built 1991 · 3 Lanes · 49,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-16-RI
Year Built
1991
Length
134.9 m (442.6 ft)
Max Span
38.1 m
Width
16.2 m (53.1 ft)
Lanes
3
Daily Traffic
49,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.