AURARIA PKWY RAMP over I25 RAMPS AND WALNUT

RAMP OVER I25 TO SB I25 · County 031, Colorado · Built 1987 · 2 Lanes · 15,048 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
F-16-NX
Year Built
1987
Length
178.9 m (586.9 ft)
Max Span
62.5 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
15,048
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.