I25 EB RAMP A PKWY over STEETS RAMPS RTD &
EB AURARIA PKWY · County 031, Colorado · Built 1988 · 3 Lanes · 106,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.741428, -105.013831
This bridge is in worse condition than 55.6% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 38 years old.
Nearby Bridges
RAMP TO I 25 SBND over RAMP TO I 25 NBND R
Built 1988
I 25 ML over RAMP TO I25 SB WALNUT ST
Built 1952
RMP TO I25/AUR.PKW over RMP TO I25 NB
Built 1988
AURARIA PKWY RAMP over I25 RAMPS AND WALNUT
Built 1987
RAMP TO US 40 ML over RAMP TOPOGRAPHY R
Built 1991
WB AURARIA PKWY over 5TH STREET AND RAILROADS
Built 1987
RAMP TO US 40 ML over RAMP TO US 40 ML R
Built 1988
I 25 ML over RDWY RR SOUTH PLATTE RVR
Built 2011
SBND I25 RAMP H over WALNUT CONNECTOR R
Built 2003
US 40 ML over I25 RDWY RR S PLATTE RVR
Built 1984
Bridge Details
- Structure #
- F-16-NY
- Year Built
- 1988
- Length
- 381.7 m (1252.3 ft)
- Max Span
- 37.6 m
- Width
- 13 m (42.7 ft)
- Lanes
- 3
- Daily Traffic
- 106,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,165,000
- Total Project Cost
- $7,747,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.