I 70 ML EBND over WILDER GULCH

1 MI E OF EAGLE SUMMIT CL · County 117, Colorado · Built 1977 · 2 Lanes · 10,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
F-12-AK
Year Built
1977
Length
69.2 m (227 ft)
Max Span
48.8 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
10,000
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,384,000
Total Project Cost
$2,076,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.