I 70 ML EBND over STAFFORD GULCH

2.5 MI E OF EAGLE SUMMIT · County 117, Colorado · Built 1977 · 2 Lanes · 10,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
F-12-AN
Year Built
1977
Length
116.7 m (382.9 ft)
Max Span
45.7 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
10,000
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,336,000
Total Project Cost
$3,504,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.