I 70 ML EBND over STAFFORD GULCH
2.5 MI E OF EAGLE SUMMIT · County 117, Colorado · Built 1977 · 2 Lanes · 10,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
39.504864, -106.1929
This bridge is in worse condition than 58.7% of bridges in County 117. The average bridge in Colorado is 0 years old; this one is 49 years old.
Nearby Bridges
I 70 ML EBND over SMITH GULCH
Built 1977
I 70 ML EBND over GULLER GULCH
Built 1977
I 70 ML WBND over CORRAL CREEK
Built 1979
I 70 ML EBND over WEST TEN MILE CREEK
Built 1977
I 70 ML EBND over WILDER GULCH
Built 1977
SHRINE PASS ROAD over I 70 ML
Built 1975
SH 91 ML over I 70 ML
Built 1977
I 70 ML over COUNTY ROAD
Built 1977
NO DATA ENTERED over RESOLUTION CREEK
Built 2011
I 70 ML WBND over FRISCO MAIN STREET
Built 1971
Bridge Details
- Structure #
- F-12-AN
- Year Built
- 1977
- Length
- 116.7 m (382.9 ft)
- Max Span
- 45.7 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 10,000
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,336,000
- Total Project Cost
- $3,504,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.