I 70 ML WBND over POLK CREEK
4.7 MI W VAIL PASS SUMMIT · County 037, Colorado · Built 2023 · 2 Lanes · 23,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.592367, -106.246869
This bridge is in worse condition than 19.7% of bridges in County 037. The average bridge in Colorado is 0 years old; this one is 3 years old.
Nearby Bridges
I 70 ML EBND over POLK CREEK
Built 1978
I 70 EBND over MILLER CREEK
Built 1977
I 70 ML WBND over MILLER CREEK
Built 1977
I 70 ML EBND over BLACK GORE CREEK
Built 1977
I 70 ML WBND over BLACK GORE CREEK
Built 1977
I 70 WBND over TIMBER CREEK
Built 1977
I 70 ML EBND over TIMBER CREEK
Built 1977
I 70 ML WBND over GAME UNDERPASS
Built 1977
I 70 ML EBND over GAME UNDERPASS
Built 1977
I 70 ML EBND over BLACK GORE CREEK
Built 1977
Bridge Details
- Structure #
- F-12-ATA
- Year Built
- 2023
- Length
- 165.8 m (544 ft)
- Max Span
- 32.8 m
- Width
- 16.8 m (55.1 ft)
- Lanes
- 2
- Daily Traffic
- 23,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,148,000
- Total Project Cost
- $15,222,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.