Ramp E over Smith Road & UPRR
21.01 MI FROM I25 · County 001, Colorado · Built 2006 · 1 Lanes · 2,200 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
39.748358, -104.717497
This bridge is in worse condition than 53.3% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 20 years old.
Nearby Bridges
E-470 SB over Smith Road & UPRR
Built 1997
E-470 NB over Smith Road & UPRR
Built 1997
SMITH ROAD over FIRST CREEK
Built 2015
E-470 SB over Ramp E
Built 2006
E-470 ML over First Creek
Built 1996
E-470 NB over Ramp E
Built 2006
E-470 Ramp G over First Creek
Built 1997
E-470 NB over 19th Avenue
Built 2006
E-470 SB over 19th Avenue
Built 2006
19TH AVE over First Creek
Built 1997
Bridge Details
- Structure #
- E-470-21.01C
- Year Built
- 2006
- Length
- 109.1 m (357.9 ft)
- Max Span
- 39.3 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 1
- Daily Traffic
- 2,200
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.