E-470 SB over 19th Avenue

20.70 MI FROM I25 · County 001, Colorado · Built 2006 · 3 Lanes · 18,115 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

39.742878, -104.71795

This bridge is in worse condition than 22.8% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 20 years old.

Nearby Bridges

Bridge Details

Structure #
E-470-20.70B
Year Built
2006
Reconstructed
2020
Length
38.9 m (127.6 ft)
Max Span
38.1 m
Width
19 m (62.3 ft)
Lanes
3
Daily Traffic
18,115
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.