E-470 SB over I-70

20.50 MI FROM I25 · County 001, Colorado · Built 2006 · 3 Lanes · 18,260 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-470-20.50B
Year Built
2006
Reconstructed
2020
Length
122.3 m (401.2 ft)
Max Span
32.6 m
Width
19.7 m (64.6 ft)
Lanes
3
Daily Traffic
18,260
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.