E-470 NB over Smith Road & UPRR

21.01 MI FROM I25 · County 001, Colorado · Built 1997 · 3 Lanes · 19,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
E-470-21.01A
Year Built
1997
Reconstructed
2020
Length
109.7 m (359.9 ft)
Max Span
39.3 m
Width
22.6 m (74.1 ft)
Lanes
3
Daily Traffic
19,200
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Private (other than railroad)
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A