I 76 ML over WASHINGTON STREET

0.3 MI E OF I 25 · County 001, Colorado · Built 1990 · 7 Lanes · 74,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-17-OV
Year Built
1990
Length
71 m (232.9 ft)
Max Span
35.1 m
Width
53.9 m (176.8 ft)
Lanes
7
Daily Traffic
74,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.