SE 2ND LEVEL EXIT over 84TH AVENUE
SE OF EAST PARKING STRUCT · County 031, Colorado · Built 1993 · 2 Lanes · 5,163 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
39.848442, -104.654539
This bridge is in worse condition than 55.6% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 33 years old.
Nearby Bridges
SE 2ND LEVEL over PARKING LOT
Built 2017
NE 2ND LEVEL PARK over PARKING LOT
Built 1993
E 2ND LEVEL PARKIN over PARKING LOT
Built 1993
SE 2ND LEVEL PARKI over PARKING GARAGE
Built 1993
SE 4/5TH LEVEL PAR over 84TH AVENUE
Built 2017
LEVEL 4 SE TERMINA over 84TH AVENUE
Built 2014
LEVEL 6 SE TERMINA over 84TH AVENUE
Built 2014
LEVEL 4 NE TERMINA over TERRAIN
Built 1993
LEVEL 6 NE TERMINA over TERRAIN
Built 1993
LEVEL 5 SE TERMINA over 84TH AVENUE
Built 2014
Bridge Details
- Structure #
- D-31-PB-750
- Year Built
- 1993
- Length
- 39.2 m (128.6 ft)
- Max Span
- 14.6 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 2
- Daily Traffic
- 5,163
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.