SE 4/5TH LEVEL PAR over 84TH AVENUE
BTWN SE GARAGES · County 031, Colorado · Built 2017 · 2 Lanes · 348 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 9 | Excellent |
Location
39.848039, -104.672014
This bridge is in worse condition than 55.6% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 9 years old.
Nearby Bridges
LEVEL 4 SE TERMINA over 84TH AVENUE
Built 2014
E 2ND LEVEL PARKIN over PARKING LOT
Built 1993
LEVEL 5 SE TERMINA over 84TH AVENUE
Built 2014
LEVEL 6 SE TERMINA over 84TH AVENUE
Built 2014
SE 2ND LEVEL PARKI over PARKING GARAGE
Built 1993
SE 2ND LEVEL over PARKING LOT
Built 2017
LEVEL 6 SW TERMINA over 84TH AVENUE
Built 2014
NE 2ND LEVEL PARK over PARKING LOT
Built 1993
LEVEL 6 NE TERMINA over TERRAIN
Built 1993
LEVEL 5 SW TERMINA over 84TH AVENUE
Built 2014
Bridge Details
- Structure #
- D-31-PB-802
- Year Built
- 2017
- Length
- 38.2 m (125.3 ft)
- Max Span
- 17.6 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 348
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.