I 25 ML SBND over RR SPUR

2.9 MI S OF JCT SH 14 · County 069, Colorado · Built 2023 · 3 Lanes · 24,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B-17-DX
Year Built
2023
Length
83.3 m (273.3 ft)
Max Span
28.3 m
Width
20.4 m (66.9 ft)
Lanes
3
Daily Traffic
24,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.