I 25 ML SBND over RR SPUR
2.9 MI S OF JCT SH 14 · County 069, Colorado · Built 2023 · 3 Lanes · 24,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
40.539075, -104.995817
This bridge is in worse condition than 33.6% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 3 years old.
Nearby Bridges
I 25 ML NBND over RR SPUR
Built 2022
I 25 ML SBND over CACHE LA POUDRE RIVER
Built 2023
I 25 ML NBND over CACHE LA POUDRE RIVER
Built 2022
County Road 40 over Fossil Creek Res. Inlet
Built 1969
HARMONY RD/OLDSH68 over I 25 ML
Built 1999
WB Harmony Road over Fossil Crk. Res. Inlet
Built 1973
County Road 38 over Cache La Poudre River
Built 2010
EB Harmony Road over Fossil Crk Res. Inlet
Built 2010
William Neal Pkwy over Fossil Ck Resv Inlet
Built 2008
County Road 5 over Cache La Poudre River
Built 1997
Bridge Details
- Structure #
- B-17-DX
- Year Built
- 2023
- Length
- 83.3 m (273.3 ft)
- Max Span
- 28.3 m
- Width
- 20.4 m (66.9 ft)
- Lanes
- 3
- Daily Traffic
- 24,500
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.