I 25 ML NBND over RR SPUR
1.1 MI N OF JCT SH 68 · County 069, Colorado · Built 2022 · 4 Lanes · 24,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
40.538564, -104.995125
This bridge is in worse condition than 33.6% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 4 years old.
Nearby Bridges
I 25 ML SBND over RR SPUR
Built 2023
I 25 ML SBND over CACHE LA POUDRE RIVER
Built 2023
I 25 ML NBND over CACHE LA POUDRE RIVER
Built 2022
HARMONY RD/OLDSH68 over I 25 ML
Built 1999
County Road 40 over Fossil Creek Res. Inlet
Built 1969
County Road 38 over Cache La Poudre River
Built 2010
WB Harmony Road over Fossil Crk. Res. Inlet
Built 1973
EB Harmony Road over Fossil Crk Res. Inlet
Built 2010
County Road 5 over Cache La Poudre River
Built 1997
William Neal Pkwy over Fossil Ck Resv Inlet
Built 2008
Bridge Details
- Structure #
- B-17-DW
- Year Built
- 2022
- Length
- 83.3 m (273.3 ft)
- Max Span
- 28.3 m
- Width
- 22.3 m (73.2 ft)
- Lanes
- 4
- Daily Traffic
- 24,500
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.