I 25 ML NBND over CACHE LA POUDRE RIVER

8.5 MI N OF JCT US 34 · County 069, Colorado · Built 2022 · 3 Lanes · 24,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B-17-DU
Year Built
2022
Length
102.4 m (336 ft)
Max Span
24.6 m
Width
20.4 m (66.9 ft)
Lanes
3
Daily Traffic
24,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.