GOLDSTONE RD over STORM DRAINAGE CHANNEL

NEAR RHINELAND DRIVE · County 071, California · Built 1960 · 2 Lanes · 1,300 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
DAPFORNTC000015
Year Built
1960
Length
13.6 m (44.6 ft)
Max Span
3.2 m
Lanes
2
Daily Traffic
1,300
Material
Concrete
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.