NORTH LOOP RD over STORM DRAINAGE CHANNEL
S OF SPANISH CANYON WAY · County 071, California · Built 1986 · 2 Lanes · 1,200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
35.257681, -116.7078
This bridge is in worse condition than 52.5% of bridges in County 071. The average bridge in California is 0 years old; this one is 40 years old.
Nearby Bridges
OUTER LOOP RD over STORM DRAINAGE CHANNEL
Built 1986
WTP RD over STORM DRAINAGE
Built 2016
GOLDSTONE RD over STORM DRAINAGE CHANNEL
Built 1960
WTP ROAD over STORM DRAINAGE
Built 2016
NORTH LOOP RD over STORM DRAINAGE CHANNEL
Built 1986
BARSTOW RD over STORM DRAINAGE
Built 1960
NORTH LOOP ROAD over STORM DRAINAGE
Built 1986
SOUTH LOOP RD over STORM DRAINAGE
Built 1986
FORT IRWIN RD over STORM DRAINAGE
Built 1986
FORT IRWIN RD over STORM DRAINAGE
Built 1986
Bridge Details
- Structure #
- DAPFORNTC000012
- Year Built
- 1986
- Length
- 19.2 m (63 ft)
- Max Span
- 9.1 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 1,200
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $10,000
- Total Project Cost
- $11,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.