NORTH LOOP RD over STORM DRAINAGE CHANNEL

N OF DESERT KING ROAD · County 071, California · Built 1986 · 2 Lanes · 1,250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
DAPFORNTC000013
Year Built
1986
Length
22.3 m (73.2 ft)
Max Span
10.7 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
1,250
Material
Prestressed Concrete
Design
Slab
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.