KUBLER RD over GREESON WASH
0.45 MI E/O BROCKMAN RD · County 025, California · Built 1940 · 2 Lanes · 100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
32.694692, -115.631578
This bridge is in worse condition than 92.6% of bridges in County 025. The average bridge in California is 0 years old; this one is 86 years old.
Nearby Bridges
BROCKMAN RD over GREESON WASH
Built 1947
ROCKWOOD RD over GREESON WASH
Built 1940
STATE ROUTE 98 over GREESON WASH
Built 1990
LYONS RD over NEW RIVER
Built 1940
STATE ROUTE 98 over WORMWOOD CANAL
Built 1955
STATE ROUTE 98 over WESTSIDE MAIN CANAL
Built 1955
LA BRUCHERIE RD over NEW RIVER
Built 1973
WAHL RD over CENTRAL MAIN CANAL
Built 1940
BROCKMAN RD over NEW RIVER
Built 1975
LA BRUCHERIE RD over CENTRAL MAIN CANAL
Built 1973
Bridge Details
- Structure #
- 58C0108
- Year Built
- 1940
- Length
- 14 m (45.9 ft)
- Max Span
- 4.6 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $109,000
- Total Project Cost
- $183,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.