STATE ROUTE 98 over WESTSIDE MAIN CANAL

11-IMP-098-22.02 · County 025, California · Built 1955 · 2 Lanes · 2,100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
58 0274
Year Built
1955
Length
46 m (150.9 ft)
Max Span
17.7 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
2,100
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,048,000
Total Project Cost
$1,761,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.