LA BRUCHERIE RD over NEW RIVER

0.6 MI N/O KUBLER RD · County 025, California · Built 1973 · 2 Lanes · 800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
58C0067
Year Built
1973
Length
30.5 m (100.1 ft)
Max Span
8.2 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
800
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.