BOWKER RD over CENTRAL MAIN CANAL

200 FT N/O COLE RD · County 025, California · Built 1957 · 2 Lanes · 2,400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
58C0031
Year Built
1957
Length
34.4 m (112.9 ft)
Max Span
11.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
2,400
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$325,000
Total Project Cost
$546,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.