ST RTE 98 BOWKER over ALL AMERICAN CANAL

11-IMP-098-34.43 · County 025, California · Built 1938 · 2 Lanes · 15,343 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
58 0260
Year Built
1938
Length
11.2 m (36.7 ft)
Max Span
5.6 m
Lanes
2
Daily Traffic
15,343
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.