STATE ROUTE 98 over CENTRAL (BRIAR) CANAL

11-IMP-098-34.83 · County 025, California · Built 1938 · 2 Lanes · 5,811 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
58 0348
Year Built
1938
Length
9 m (29.5 ft)
Max Span
2.7 m
Width
23 m (75.5 ft)
Lanes
2
Daily Traffic
5,811
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.