SCRIPPS POWAY PKWY over BEELER CREEK

AT POMERADO ROAD · County 073, California · Built 1988 · 8 Lanes · 43,631 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
57C0593
Year Built
1988
Length
15.5 m (50.9 ft)
Max Span
4.2 m
Lanes
8
Daily Traffic
43,631
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.