POWAY ROAD over POMERADO CREEK

0.1M W/O POMERADO RD · County 073, California · Built 1951 · 5 Lanes · 30,900 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
57C0280
Year Built
1951
Reconstructed
1964
Length
14.6 m (47.9 ft)
Max Span
4.2 m
Width
28.7 m (94.2 ft)
Lanes
5
Daily Traffic
30,900
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.