SPRINGHURST DR. over PENASQUITOS CREEK

0.1MI S/O POWAY RD · County 073, California · Built 1988 · 3 Lanes · 1,870 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
57C0675
Year Built
1988
Length
67 m (219.8 ft)
Max Span
26.5 m
Width
15.8 m (51.8 ft)
Lanes
3
Daily Traffic
1,870
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.