ROUTE 125 SB over SAN MIGUEL CREEK

11-SD-125-6.80 · County 073, California · Built 2007 · 2 Lanes · 34,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
57 1198L
Year Built
2007
Length
65.4 m (214.6 ft)
Max Span
65.4 m
Width
17.8 m (58.4 ft)
Lanes
2
Daily Traffic
34,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.