SAN MIGUEL RNCH RD over ROUTE 125
11-SD-125-6.05 · County 073, California · Built 2007 · 5 Lanes · 11,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.670625, -116.985317
This bridge is in worse condition than 18.4% of bridges in County 073. The average bridge in California is 0 years old; this one is 19 years old.
Nearby Bridges
ROUTE 125 NB over PROCTOR VALLEY ROAD
Built 2007
ROUTE 125 SB over PROCTOR VALLEY ROAD
Built 2007
ROUTE 125 SB over SAN MIGUEL CREEK
Built 2007
ROUTE 125 NB over SAN MIGUEL CREEK
Built 2007
SAN MIGUEL RD over ROUTE 125
Built 2008
ROUTE 125 NB over EAST H STREET
Built 2007
ROUTE 125 SB over EAST H STREET
Built 2007
ROUTE 125 SB over SUMMIT MEADOW RD
Built 2008
ROUTE 125 NB over SUMMIT MEADOW RD
Built 2008
LOMA DEL SOL DR over SWEETWATER RIV TRIBUTARY
Built 1977
Bridge Details
- Structure #
- 57 1190
- Year Built
- 2007
- Length
- 77.5 m (254.3 ft)
- Max Span
- 39.1 m
- Width
- 32.7 m (107.3 ft)
- Lanes
- 5
- Daily Traffic
- 11,300
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.