ROUTE 125 NB over SUMMIT MEADOW RD
11-SD-125-7.39 · County 073, California · Built 2008 · 2 Lanes · 34,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.682022, -116.998008
This bridge is in worse condition than 65.2% of bridges in County 073. The average bridge in California is 0 years old; this one is 18 years old.
Nearby Bridges
ROUTE 125 SB over SUMMIT MEADOW RD
Built 2008
SAN MIGUEL RD over ROUTE 125
Built 2008
ROUTE 125 SB over SAN MIGUEL CREEK
Built 2007
ROUTE 125 NB over SAN MIGUEL CREEK
Built 2007
LOMA DEL SOL DR over SWEETWATER RIV TRIBUTARY
Built 1977
NB 125-WB 54 CONN over SWEETWATER RIVER
Built 2008
SAN MIGUEL RNCH RD over ROUTE 125
Built 2007
E54-S125 CONNECTOR over SWEETWATER RIVER
Built 2008
DAWSONIA ST over SWEETWATER RIV TRIBUTARY
Built 1986
BONITA ROAD over SWEETWATER RIVER
Built 1997
Bridge Details
- Structure #
- 57 1175R
- Year Built
- 2008
- Length
- 38 m (124.7 ft)
- Max Span
- 38 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 34,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.