GROSSMONT BL-N125 over N125-E8 CONNECTOR RAMP

11-SD-125-R15.21-LMSA · County 073, California · Built 1993 · 1 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
57 0969S
Year Built
1993
Length
146.6 m (481 ft)
Max Span
66.8 m
Width
8.3 m (27.2 ft)
Lanes
1
Daily Traffic
2,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.