STATE ROUTE 125 over GROSSMONT BLVD

11-SD-125-R15.09-LMSA · County 073, California · Built 1990 · 5 Lanes · 79,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
57 0312L
Year Built
1990
Length
38.1 m (125 ft)
Max Span
37.5 m
Width
30.7 m (100.7 ft)
Lanes
5
Daily Traffic
79,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.