STATE ROUTE 125 SB over I 8 & CONNECTORS

11-SD-125-R15.35-LMSA · County 073, California · Built 1993 · 3 Lanes · 79,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
57 0950L
Year Built
1993
Length
165.2 m (542 ft)
Max Span
52.1 m
Width
17.3 m (56.8 ft)
Lanes
3
Daily Traffic
79,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.