MISSION CITY PKWY over INTERSTATE 8
11-SD-008-4.86-SD · County 073, California · Built 1972 · 2 Lanes · 4,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.774875, -117.124414
This bridge is in worse condition than 18.4% of bridges in County 073. The average bridge in California is 0 years old; this one is 54 years old.
Nearby Bridges
W8-N805 CONNECTOR over CAMINO DEL RIO NORTH
Built 1972
W8-S805 CONNECTOR over I 8 CONNS CAMINO DEL RIO
Built 1972
N805-E8 CONNECTOR over CAMINO DEL RIO SOUTH
Built 1972
S805-E8 CONNECTOR over I-8 CAMINO DEL RIO N RMP
Built 1972
INTERSTATE 805 NB over I-8 RMPS STS SDRIV RAILS
Built 1972
INTERSTATE 805 SB over I-8 RMPS STS SDRIV RAILS
Built 1972
N805-W8 CONNECTOR over I 8 CAMINO DEL RIO SOUTH
Built 1972
E8-N805 CONNECTOR over I 8 RAMPS CAMINO DEL RIO
Built 1972
S805-W8 CONNECTOR over CAMINO DEL RIO N & RAMP
Built 1974
E8-S805 CONNECTOR over CAMINO DEL RIO SOUTH
Built 1972
Bridge Details
- Structure #
- 57 0758
- Year Built
- 1972
- Length
- 80.8 m (265.1 ft)
- Max Span
- 42.1 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 4,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.