N805-E8 CONNECTOR over CAMINO DEL RIO SOUTH

11-SD-805-17.54-SD · County 073, California · Built 1972 · 1 Lanes · 8,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
57 0719G
Year Built
1972
Length
138.1 m (453.1 ft)
Max Span
30.2 m
Width
8.8 m (28.9 ft)
Lanes
1
Daily Traffic
8,400
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.