W8-N805 CONNECTOR over CAMINO DEL RIO NORTH

11-SD-008-4.39-SD · County 073, California · Built 1972 · 2 Lanes · 26,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 0723F
Year Built
1972
Length
309.4 m (1015.1 ft)
Max Span
28.7 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
26,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.