INTERSTATE 8 over FAIRMOUNT AV-W8 ON-RAMP

11-SD-008-6.32-SD · County 073, California · Built 1958 · 13 Lanes · 217,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 0348
Year Built
1958
Reconstructed
1993
Length
34.1 m (111.9 ft)
Max Span
14.6 m
Width
60.1 m (197.2 ft)
Lanes
13
Daily Traffic
217,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.