S.DIEGO MISSION RD over SAN DIEGO RIVER
0.17MI W/O FAIRMOUNT AVE · County 073, California · Built 1985 · 2 Lanes · 2,880 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
32.783614, -117.104286
This bridge is in worse condition than 57.1% of bridges in County 073. The average bridge in California is 0 years old; this one is 41 years old.
Nearby Bridges
MISSION GORGE RD over ALVARADO FLOOD CNTL CHAN
Built 1952
INTERSTATE 8 over FAIRMOUNT AV-W8 ON-RAMP
Built 1958
NB FAIRMOUNT-W8 ON over FAIRMOUNT AVE
Built 1958
INTERSTATE 8 over FAIRMOUNT AVE
Built 1958
W8-FAIRMOUNT OFF over ALVARADO CANYON RD EB
Built 1979
WARD ROAD over SAN DIEGO RIVER
Built 1985
FRIARS RD over SAN DIEGO RIVER
Built 1967
FRIARS RD over SAN DIEGO RIVER
Built 1967
W8-S15 CONNECTOR over FAIRMOUNT AVE-W8 ON-RAMP
Built 2005
INTERSTATE 15 over SAN DIEGO RIVER
Built 1960
Bridge Details
- Structure #
- 57C0711
- Year Built
- 1985
- Length
- 18.5 m (60.7 ft)
- Max Span
- 1.5 m
- Width
- 29 m (95.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,880
- Material
- Steel
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.