E8-S15 CONNECTOR over CAMINO DEL RIO SOUTH
11-SD-008-5.62-SD · County 073, California · Built 1986 · 1 Lanes · 9,100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.777225, -117.111156
This bridge is in worse condition than 18.4% of bridges in County 073. The average bridge in California is 0 years old; this one is 40 years old.
Nearby Bridges
INTERSTATE 15 over CAMINO DEL RIO SOUTH
Built 1986
N15-E8 CONNECTOR over CAMINO DEL RIO SO RAMPS
Built 1986
N15-W8 CONNECTOR over I-15 I-8 RAMP & LOCAL
Built 1986
INTERSTATE 15 NB over ROUTE 8
Built 1960
INTERSTATE 15 SB over ROUTE 8
Built 1960
W8-N15 CONNECTOR over FAIRMOUNT AVE-W8 ON-RAMP
Built 1984
S15-CAMINO DEL RIO over I 8 & CONNECTOR RMPS
Built 1986
W8-S15 CONNECTOR over FAIRMOUNT AVE-W8 ON-RAMP
Built 2005
WARD ROAD over SAN DIEGO RIVER
Built 1985
S15-E/W8 CONNECTOR over I-15 & I-8
Built 1984
Bridge Details
- Structure #
- 57 0883G
- Year Built
- 1986
- Length
- 72.2 m (236.9 ft)
- Max Span
- 36.3 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 1
- Daily Traffic
- 9,100
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.