TRAMWAY ROAD over CHINO CANYON CREEK

AT TRAMWAY BLDG (3.7 MI W · County 065, California · Built 1985 · 1 Lanes · 1,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
56P0003
Year Built
1985
Length
23.5 m (77.1 ft)
Max Span
22.9 m
Width
7.3 m (24 ft)
Lanes
1
Daily Traffic
1,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Local Park, Forest, or Reservation Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.