TRAMWAY RD over CHINO CANYON CREEK
3.5 MI W/O SR 111 PALM SP · County 065, California · Built 1985 · 1 Lanes · 1,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.839383, -116.613564
This bridge is in worse condition than 20.2% of bridges in County 065. The average bridge in California is 0 years old; this one is 41 years old.
Nearby Bridges
TRAMWAY ROAD over CHINO CANYON CREEK
Built 1985
STATE ROUTE 111 SB over CHINO CREEK
Built 1948
STATE ROUTE 111 NB over WINDY POINT CANYON
Built 1948
STATE ROUTE 111 NB over BLAISDELL CANYON
Built 1948
STATE ROUTE 111 NB over SNOW CREEK
Built 1965
STATE ROUTE 111 SB over SNOW CREEK
Built 1937
BELARDO ROAD over TAHQUITZ CREEK
Built 2012
CALLE ENCILIA over BARISTO FLOOD CONTROL CH
Built 1966
CALLE EL SEGUNDO over BARISTO FLOOD CONTROL CH
Built 1966
N PALM CANYON DR over TAHQUITZ CREEK CHANNEL
Built 1930
Bridge Details
- Structure #
- 56P0002
- Year Built
- 1985
- Length
- 23.3 m (76.4 ft)
- Max Span
- 22.9 m
- Width
- 7.3 m (24 ft)
- Lanes
- 1
- Daily Traffic
- 1,300
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Park, Forest, or Reservation Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.