N PALM CANYON DR over TAHQUITZ CREEK CHANNEL

0.4 MI. S/O RAMON ROAD · County 065, California · Built 1930 · 4 Lanes · 10,969 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56C0408
Year Built
1930
Reconstructed
1956
Length
18.3 m (60 ft)
Max Span
18.3 m
Width
19.5 m (64 ft)
Lanes
4
Daily Traffic
10,969
Material
Concrete
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.