ROUTE 074 over WASSON CREEK
1000 FT NW WASSON CYN RD · County 065, California · Built 2002 · 5 Lanes · 25,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.716772, -117.299264
This bridge is in worse condition than 20.2% of bridges in County 065. The average bridge in California is 0 years old; this one is 24 years old.
Nearby Bridges
ROUTE 074 over PEACH CREEK
Built 2002
INTERSTATE 15 NB over ROUTE 74 (CENTRAL AVE)
Built 1980
DEXTER AVENUE over ARROYO DEL TORO CHANNEL
Built 2006
INTERSTATE 15 SB over STATE ROUTE 74
Built 1980
INTERSTATE 15 SB over WASSON CANYON WASH
Built 1982
INTERSTATE 15 NB over WASSON CANYON WASH
Built 1982
COLLIER AVENUE over FLOOD CONTROL CHANNEL
Built 1993
COLLIER AVENUE over WASSON DEBRIS BASIN
Built 1990
MINTHORN STREET over WASSON DEBRIS BASIN
Built 1990
INTERSTATE 15 SB over MAIN STREET
Built 1982
Bridge Details
- Structure #
- 56C0634
- Year Built
- 2002
- Length
- 11.5 m (37.7 ft)
- Max Span
- 3.6 m
- Lanes
- 5
- Daily Traffic
- 25,000
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.