NUEVO ROAD over RCTC BNSF RY & A ST
0.1 MI W/O ROUTE 215 FWY · County 065, California · Built 1994 · 4 Lanes · 10,554 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.803308, -117.234428
This bridge is in worse condition than 64.1% of bridges in County 065. The average bridge in California is 0 years old; this one is 32 years old.
Nearby Bridges
NUEVO ROAD over INTERSTATE 215
Built 1994
D ST-N 215 ON RAMP over INTERSTATE 215
Built 2016
PERRIS BLVD over INTERSTATE 215
Built 2016
CITRUS AVENUE over PERRIS VALLEYADPLINE ""K""
Built 1990
PLACENTIA AVE over INTERSTATE 215
Built 1994
PLACENTIA AVENUE over RCTC & BNSF RY
Built 1994
E NUEVO ROAD over PERRIS VALLEY STORM DRN
Built 2021
STATE ROUTE 74 over INTERSTATE 215
Built 2011
ORANGE AVENUE over PERRIS VALLEY STORMDRAIN
Built 2010
EVANS ROAD over PERRIS VALLEY LINE ""Q""
Built 2010
Bridge Details
- Structure #
- 56C0452
- Year Built
- 1994
- Length
- 101.4 m (332.7 ft)
- Max Span
- 51 m
- Width
- 26.8 m (87.9 ft)
- Lanes
- 4
- Daily Traffic
- 10,554
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.