PLACENTIA AVE over INTERSTATE 215
08-RIV-215-R29.50-PER · County 065, California · Built 1994 · 5 Lanes · 4,140 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.823139, -117.241097
This bridge is in worse condition than 20.2% of bridges in County 065. The average bridge in California is 0 years old; this one is 32 years old.
Nearby Bridges
PLACENTIA AVENUE over RCTC & BNSF RY
Built 1994
INTERSTATE 215 over WALLISER DRAIN
Built 1994
NUEVO ROAD over RCTC BNSF RY & A ST
Built 1994
NUEVO ROAD over INTERSTATE 215
Built 1994
RAMONA EXPRESSWAY over INTERSTATE 215
Built 1984
CAJALCO ROAD over RCTC & BNSF RY
Built 1984
CITRUS AVENUE over PERRIS VALLEYADPLINE ""K""
Built 1990
RIDER ST over PERRIS VALLEY STORMDRAIN
Built 2005
ORANGE AVENUE over PERRIS VALLEY STORMDRAIN
Built 2010
RAMONA EXPRESSWAY over PERRIS VALLEY STORM DRN
Built 1956
Bridge Details
- Structure #
- 56 0763
- Year Built
- 1994
- Length
- 65.3 m (214.2 ft)
- Max Span
- 34.4 m
- Width
- 34.2 m (112.2 ft)
- Lanes
- 5
- Daily Traffic
- 4,140
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.